Maccaferri Products Provide Solutions for the Mining Industry

Published: February 1, 2019 |

[Click image to enlarge]

[Click image to enlarge]

[Click image to enlarge]

Maccaferri provides innovative engineered solutions for the mining industry, including: rockfall protection, erosion control, ground stabilization, fiber reinforced concrete, retaining walls, and cost effective construction for tip and crusher walls.

Wherever problems exist in the life cycle of a mine, Maccaferri products and solutions can help. From access and materials handling infrastructure, rockfall hazard mitigation, product concentration and leachate storage, to dewatering and site remediation, these solutions are proven to reduce safety risks, reduce construction costs, and maintain operations.

Rockfall Hazard Mitigation in Open Cast Mines

Slopes within open cast mines can be steep to maximize extraction volume and minimize the space for infrastructure. Loose material detaching from these slopes affects mine safety and operations. Maccaferri offers high-tensile steel cable meshes and drapery mesh to contain rocks and provide surface stabilization. Steelgrid HR is available in tensile strengths greater than 118,010 lbf/ft (160kN/m), and HEA cable panels for demanding loads up to 147,512 lbf/ft (200kN/m).

Maccaferri’s range of flexible rockfall protection barriers is available certified by ETAG up to 1,844 ft-ton (5,000kJ) (MEL) energy absorption. Attached to the rock slope above critical infrastructure (haul roads, conveyors, tips, and crushers), these barriers progressively deform under impact, absorbing loads. Attenuator and hybrid barriers are also available.

Rockfall protection embankments, featuring soil reinforced with geogrids, offer up to 20,000kJ energy absorption capacity and can accommodate multiple impacts without extensive maintenance — a significant advantage for cost-conscious mine operators.

Mine Access and Materials Handling Infrastructure

Tip and crusher walls constructed from soil which is reinforced with Maccaferri geogrids produce cost-effective structures. Wherever possible, Maccaferri tries to reuse on-site structural backfill in combination with Paralink®, the best geogrid to resist damage installation on the market, and MacGrid® geogrids to create reinforced soil structures, reducing costs and material waste.

With geogrid strengths up to 1,600kN/m, even the heaviest vehicles can be accommodated, and many crusher walls over 20m have been constructed. Maccaferri’s soil reinforcement structures are available with a variety of face-finishes, including:
•  Green Terramesh, Paragrid, or MacGrid® geogrid reinforcement for sloped vegetating faces
•  Terramesh soil reinforcement system for gabion faced structures
•  MacRES® for vertical faced concrete panel walls

Lagoon Lining Systems, Heap Leach Pads and Product Concentration

MacLine® impermeable membranes waterproof lagoons and heap leach pads, containing concentrates and avoiding infiltration into the natural ground. Combined with MacDrain® drainage geocomposites, leachates can be collected efficiently and reliably.

Containment dykes often feature Maccaferri MacGrid® for reinforced soil. Gabion retaining structures and major dump zones can also be supported on basal reinforced platforms. These platforms are reinforced with Paralink®, a high strength geogrid, or MacTex®, a high strength woven geotextile, which is a polyester reinforcement providing long-term high strength and low strain to minimize differential settlements.

MacTube® geotextile tubes are used for dewatering mine tailings, sludge ponds, or slurries. Slurry is pumped into the MacTube®, which is designed to retain the solid particles, while the filtrate fluids are released through the filter fabric of the tube walls. Once drained, the solid residue is dried before being disposed of in a controlled manner.

Erosion Control and Mine Remediation

Reinstatement of the mine is vital. Maccaferri offers MacLine® impermeable cappings and drainage systems to prevent surface water entering the deposits. MacDrain® drainage geocomposites are available with a wide range of filters and core types to provide flow capacity under a variety of load conditions.

The rapid re-establishment of vegetation and soil erosion protection systems completes the closure operations. Maccaferri’s wide range of man-made MacMat® and biodegradable BioMac soil stabilization solutions facilitate this. These erosion control revetment mats provide immediate erosion protection from rainfall impact or run-off and long-term root reinforcement.

Shotcrete and Roof Support in Underground Mines

Maccaferri’s Pararib tunnel reinforcement mesh contains loose and falling debris from shafts and excavations. Pararib is lightweight, white, and flame retardant, making it ideal for underground use.

Wirand fibers are added to shotcrete to reinforce it and provide stabilization of shafts, excavations, and access tunnels. It can even replace traditional steel reinforcement mesh.

Quality Mining Products and Services

Maccaferri aims to build mutually beneficial relationships with clients through the quality of its service and solutions. With nearly 30 manufacturing facilities around the world and more than 60 operating companies in 100 countries worldwide, Maccaferri’s engineers offer technical support, including analysis, design, solution selection, and installation supervision.

Click on PDF file in upper right corner to view more details.

For more information:
Phone: 800-638-7744
Fax: 301-223-4950
E-mail: .(JavaScript must be enabled to view this email address)

To stop by Maccaferri’s website, CLICK HERE


Be in-the-know when you’re on-the-go!

FREE eNews delivery service to your email twice-weekly. With a focus on lead-driven news, our news service will help you develop new business contacts on an on-going basis.

CLICK HERE to register your email address.


Copyright © 2019 Mining Connection LLC. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed without permission.

For licensing permission, .(JavaScript must be enabled to view this email address)

Advertisement




Advertisement




Advertisement




Advertisement




Advertisement




Advertisement




Advertisement




Advertisement